This is a typical PV system being installed on a detached house in Hove.

8 x 185W Sharp mono crystalline PV modules combine to give a 1.48 kWp ystem. The DC electricity is fed to a SMA SB1200 inverter, in this case located in the garage next to the distribution board.

The Total Generation Meter is located inside the property for ease of access for the FIT readings.

Annual yield expected 1,250 kWh Total energy yield over 25 years expected 30,500 kWh Total CO2 offset over 25 years expected 16,500 kg Total FIT earnings over 25 years expected £13,678